skip to Main Content

Dear Neighbors,

Thank you for your interest in the Takoma Park/Silver Spring Campus construction projects. We strive to keep our neighbors informed about significant construction events with this weekly email notification.

This notice will continue to provide information on the construction of the Catherine and Isiah Leggett Building construction and will now include updates regarding the HVAC rooftop replacement on Pavilions 1 and 2 (P1 and P2) and the campus library renovation in the Resource Center.

Upcoming activities are listed below:

Pavilions 1 and 2—HVAC Replacement 
  • Rooftop Work: HVAC units will continue to be tested. 
  • Dumpster Removal: The site dumpster will be removed and replaced from New York Avenue two times during the week. Vehicular and pedestrian traffic will be monitored.  
  • Deliveries: Small deliveries are expected on Chicago Avenue inside the project site.
  • Saturday Work: Henley Construction will conduct interior work on Saturday, October 15, and Saturday, October 22. All work will follow the requirements of the noise ordinance.
Leggett Building—Construction 
  • Weather Preparation: Plastic sheets are being temporarily placed on the exterior openings to prepare for winter weather.
  • Deliveries: Materials are being delivered on site for use within the structure. All trucks are required to follow designated routes to and from the site and must enter and exit on Fenton Street from Philadelphia.
  • Interior Work: Work on the interior of the structure continues.
Library/Resource Center—Renovation
  • No project updates at this time. 

Please visit our website for additional information on all three TP/SS construction projects. As always, you may contact us with questions at community@montgomerycollege.edu or call the project hotline at 800-879-9879.

Thank you,
The Montgomery College Team

Back To Top